| Title |
Author |
Page |
Extended Summary |
| Development of Support System for Setting and Coordination between Protection Relays | H. Kameda, S. Uemura, Y. Uchikawa, & T. Nakajima | 10 |  |
| A Method for Selecting the Lines to be opened to Minimize the Imbalance between Total Generator Output and Total Loads in a Separated Power System | T. Sakairi & M. Sato | 17 |  |
| Mechanism of Occurring Over-Voltage Phenomena in Distributed Power System on Energization of Transformers | Y. Nakachi, F. Ueda, T. Kajikawa, T. Amau, H. Kameyama, & H. Ito | 25 |  |
| Development of a Digital Protection Relay Corresponding with a Multi-range Current Transformer for High Voltage Equipments | T. Kanayama, Y. Kawasaki, K. Hosotani, Y. Fujita, T. Okitsu, H. Shirasuna,
H. Ookawa, K. Sumitani, & H. Yamaguchi | 35 |  |
| Applying Real-Time Simulator to Microgrid and Verification Results of its Accuracy | T. Tanabe, H. Nakashima, H. Shinji, T. Funabashi, & R. Yokoyama | 41 |  |
| Development of Fault Detection System using Wavelength Division Multiplexing Transmission of Optical Fiber Current Sensor | M. Kayaki, T. Hirata, K. Kurosawa, R. Kondo, T. Yamada, & E. Itakura | 49 |  |
| An Integrated Support System for Protective Relay Setting with Advanced Assistance Functions | M. Sato, M. Sato, K. Goto, & T. Yamada | 55 |  |
| Study on Analysis of Failure and Reliability of First and Second Generation Digital Relays | H. Kameda | 61 |  |
| Trend of EMC Standards for Protective Relays | T. Matsumoto, N. Suga, & M. Seki | 67 |  |
| Development of Protection and Control Unit for Distribution Substation | F. Iguchi, H. Hayashi, M. Takeuchi, M. Kido, T. Kobayashi, & A. Yanaoka | 75 |  |
| Inspection of the Switching Surge for the Digital-Control-Panel Adjacent to 500 kV GIS | T. Sato, Y. Matsushita, Y. Shinki, T. Yamaji A. Hamano, & Y. Shiraki | 84 |  |
| Development Report for Islanded System Automatic Synchronizer and Predictive Step Out Prevention Relay System using Power Flow Parameters | T. Yasuda, T. Nishi, M. Inukai, & S. Miura | 91 |  |
| A New Computation Method for Thermal Capacity and Voltage Constraints TTC Considering Mho Relay Operating Conditions | N. Yorino, Y. Zoka, H. Suenari, A. Kawamoto, & S. Li | 100 |  |
| Estimation Method of Center of Inertia Frequency based on Multiple Synchronized Phasor Measurement Data | T. Hashiguchi, M. Watanabe, T. Goda, Y. Mitani, O. Saeki, M. Hojo, &
H. Ukai | 106 |  |
| A Functional Optimization based Calculation Scheme for Dynamic Economic Load Dispatch Considering Ramp Rate of Thermal Units Output | T. Kumano | 114 |  |
| Field Test Result of 10 MVA/20 MJ SMES for Load Fluctuation Compensation | S. Nagaya, T. Nagata, N. Hirano T. Tamada, Y. Nijo, T. Katagiri, &
M. Yamane | 126 |  |